The water has been green since August, the cover sags with leaves, and the pool company just quoted another season of chemicals. At some point the question flips from how to fix the pool to how to make it disappear. HomeGuide’s pool removal cost data puts an inground partial fill-in at $2,000 to $10,300 and a full removal at $4,300 to $16,400, while an above-ground pool comes down for $300 to $800.
Those totals arrive in installments, though, and some of them land years after the excavator leaves. Below, the job runs in the order you will pay for it: the decision, the permit, the dig, the dirt, the lawn and, eventually, the sale of the house.
The whole job on one calendar
Ranges in the table come from the national cost guides linked throughout; the fill line is HomeAdvisor’s estimate for a 16-by-32-foot pool five feet deep. Your own numbers will move with access for equipment, soil and local dump fees.
| Stage | When it happens | Typical cost |
|---|---|---|
| Choose partial or full removal | Before you call anyone | Sets the range: $2,000–$10,300 partial, $4,300–$16,400 full |
| Permit | Before demolition | $50–$250; about $200 is typical |
| Engineer and compaction testing | Planning and backfill | $100–$200 an hour; $250–$1,000 for compaction |
| Drain, cap lines, pull equipment | Day one | Up to $175 to drain; electrician $75–$150 an hour |
| Break the shell, remove the deck, haul debris | Days one to seven | Labor $1,000–$3,000; deck $500–$1,700; disposal $150–$500 |
| Fill dirt (16×32 pool) | Final days of the job | $475–$1,425 for about 95 cubic yards |
| Seed or sod | Week two onward | Seed $0.10–$0.20 a sq ft; sod $1.50–$3.00 a sq ft |
| Disclosure at sale | Years later | No fee, but partial fills can cost you on price |
Source: HomeGuide, Angi and HomeAdvisor pool removal cost guides, linked in the sections below.
Before the first call: partial fill or full removal
This choice moves the bill more than anything that follows. A partial fill-in, sometimes called abandonment, knocks the top of the walls down, punches drainage holes through the floor and buries the rest. A full removal breaks out and hauls away every piece of shell, then fills a clean hole with compacted soil. Angi’s pool removal pricing puts the national average near $6,000, with most jobs between $5,000 and $8,000, and inground removals reaching $15,000 or more.
Pool construction narrows your options. Angi says vinyl pools require full removal, at $3,000 to $10,000, because an engineer has to check what is behind the liner. Fiberglass runs $5,000 to $15,000. Concrete and gunite pools are the ones most often filled partially, at $3,000 to $15,000, simply because there is so much concrete to break.
| Pool size | Partial fill-in | Full removal |
|---|---|---|
| 10 x 20 ft | $2,000–$6,200 | $4,300–$10,800 |
| 15 x 30 ft | $2,500–$8,100 | $4,100–$13,400 |
| 18 x 36 ft | $2,800–$9,300 | $5,600–$15,100 |
| 20 x 40 ft | $3,000–$10,300 | $6,100–$16,400 |
| 30 x 50 ft | $4,100–$14,700 | $8,000–$22,500 |
Source: Angi’s pool removal cost by size.
Set the removal quote against what the pool costs to keep. If you have not added up a year of chemicals, opening, closing and repairs, look at what a year of pool maintenance runs first; a removal that pays for itself in three or four seasons is an easier call than one that takes ten.
Weeks before the dig: the permit and the engineer
Almost every jurisdiction wants a permit, and the fee is the smallest line on the job. HomeAdvisor’s fill-in cost guide puts permits at $50 to $250, with $200 typical. Mountain View, California, charges a flat $100 including inspection, and still asks for a lot in return: demolition at least 12 inches below finish grade, at least 20% of the pool floor punched out, and a compaction report from a licensed geotechnical engineer at final inspection.
That engineer is where the paperwork turns into money. Angi lists structural engineers at $100 to $200 an hour and soil compaction work at $250 to $1,000. Whether you need one often depends on what you plan to put on the spot later. San José’s permit center, updated in April 2026, splits pool demolitions into two paths: a simple one for areas declared non-buildable, and an engineered one with a stamped demolition, drainage and compaction plan for owners who want to build there someday.
Rules keep getting more specific, too. Maricopa County, Arizona, adopted a pool and spa demolition directive in November 2025 that spells out three methods. A partial removal must cut the walls at least 18 inches below grade and open two holes of at least 2 by 2 feet in the floor. Anyone planning a building over or within 5 feet of the old pool needs engineer-supervised backfill at 90% relative density, and a pool abandoned in place cannot have any structure on or within 5 feet of it at all. No national price changes for 2027 have been announced, but expect your county’s handout to look more like this one than less.
Day one: draining the water and cutting the utilities
Angi says draining takes about 24 hours and costs up to $175 when a pro does it, or $40 to $70 to rent a pump yourself. Ask your city where the water may go; many do not allow pool water into the storm drain. The same day, gas, water and drain lines get capped and the pump, filter and heater come out. Electrical work is billed separately at $75 to $150 an hour, and permit offices typically want abandoned wiring pulled back to the panel, not just switched off.
Days one through seven: breaking concrete and paying by the truckload
HomeAdvisor says a partial job takes one to three days and a full removal three to seven. Angi prices the labor at $1,000 to $3,000 and debris disposal at $150 to $500; Fixr’s January 2025 breakdown adds $200 to $550 for a dumpster and $320 to $800 for cleanup. A concrete deck around the pool is its own line: HomeAdvisor puts its removal at $500 to $1,700.
In a partial job, some of that broken concrete never leaves the yard. Maricopa County allows pool wall debris to serve as fill in a partial removal, which is a big reason abandonment costs less: you skip most of the hauling. The trade-off is that the old shell stays buried, and so does the record of it.

The backfill: cheap dirt, expensive compaction
Fill is priced by the cubic yard, and a residential pool swallows more of it than most owners expect. HomeAdvisor works the math at $5 to $15 a cubic yard before labor: a 12-by-24 pool five feet deep needs about 53 cubic yards, or $265 to $795; a 15-by-30 needs about 83 yards, or $416 to $1,245; a 16-by-32 needs about 95 yards, or $475 to $1,425.
- Gravel: $5 to $8 a cubic yard, often used as a drainage layer at the bottom
- Fill dirt: $8 to $12 a cubic yard
- Topsoil: $12 to $15 a cubic yard, about 18 inches deep for grass and up to 36 inches for planting beds
- Concrete: $104 to $144 a cubic yard delivered and leveled, for the rare owner who wants a slab-solid fill
The dirt itself is rarely what goes wrong. Fill dumped in one pass and left to settle on its own sinks for years. HomeGuide’s process calls for about 12 inches of gravel at the base of a partial removal and fill that is mostly compacted soil capped with topsoil, placed in layers. If a quote lists fill but no compaction and no engineer, ask what density the crew will hit and who will test it.
Week two and after: grass, a patio or a deck on top
The hole is full; now something has to grow or sit on it. Angi prices grass seed at $0.10 to $0.20 a square foot and sod at $1.50 to $3.00. On the 512-square-foot footprint of a 16-by-32 pool, that is roughly $50 to $100 for seed or $770 to $1,540 for sod, by our math, before any extra soil prep. For a lawn that has to look finished before a listing photo, it pays to read up on how sod is priced and what goes under it before you choose.

Bigger plans raise the bill fast. Fixr puts a garden conversion at $8,000 to $20,000 and turning the pool area into a deck at $10,000 to $25,000. A deck is also the use most likely to trigger the engineered-fill rules above, so price a wood or composite deck build alongside the removal and tell the demolition contractor before backfill starts. Paying for compaction once is cheaper than digging the yard up again.
The first year: watching the ground
Even well-compacted fill can move a little through the first wet season, and low spots show up as puddles or dips in the new lawn. None of the cost guides put a price on this, so handle it in the contract: ask whether the contractor will return to top up settled areas, for how long, and whether added topsoil is included. A free return visit in spring is worth more than a lower bid without one.
Years later: the buyer’s questions
This is the bill partial fill-ins defer. Angi and HomeAdvisor both say a partially filled pool must be disclosed when you sell and can reduce a home’s value or limit what can be built on that part of the lot, while HomeAdvisor says full removal maintains property value. Angi adds that a pool under about 15 years old and in good condition can add value, which is a reason to price a repair before you price a demolition.
A buyer who learns about a buried shell from a disclosure form, rather than from a permit file with a compaction report attached, tends to negotiate. If a sale is likely within a few years, get a feel for what buyers already pay to close on a house; they are rarely in the mood to absorb an engineering question on top.
The folder to keep when the crew leaves
Whichever method you choose, the job is only finished when the paperwork is. Before the final payment, collect:
- The demolition permit with its final inspection signed off
- The site plan showing exactly where the pool was and how deep the walls were cut
- The compaction report, if an engineer tested the fill, with the density reached
- A note of any build restriction recorded on the permit, such as Maricopa’s 5-foot rule
- The contractor’s written promise on settling repairs, with an end date
Questions owners ask about filling in a pool
How much does it cost to remove an above-ground pool?
HomeGuide and Angi put above-ground pool removal at $300 to $800, and Angi says it usually takes under four hours. HomeAdvisor notes that a pool with an attached deck can cost up to $5,000 to remove.
Can I fill in a pool myself to save money?
Some owners do. HomeGuide estimates a DIY fill-in at $1,800 to $6,200 against $2,000 to $16,400 for a contractor. You still need the permit, and many jurisdictions require an engineer’s compaction report if anything will ever be built on the spot, so the savings are mostly labor.
How much is pool removal per square foot?
Angi works out to about $13.50 per square foot of pool, which puts a 16-by-32 pool near $6,900 and a 20-by-40 pool near $10,800. Depth, access and the type of shell can move that a lot.
Can a pool be filled with concrete instead of dirt?
Yes, but it costs more. HomeAdvisor lists concrete at $104 to $144 per cubic yard delivered and leveled. For a 12-by-24 pool needing about 53 cubic yards, that is roughly $5,500 to $7,600 for the fill alone, by our math, against a few hundred dollars for dirt.
Can I just leave the pool shell in place and plant over it?
Some counties allow it. Maricopa County permits abandoning a pool in place with drain holes cut in the floor, but bans any new building or structure on or within 5 feet of it. Check your local building department before choosing this route.
Where the numbers come from
- How much does it cost to remove or fill in a pool?, HomeGuide
- How Much Does Pool Removal Cost?, Angi
- How Much Does It Cost to Fill in a Pool?, HomeAdvisor
- Cost to Fill In Pool, Fixr (updated January 31, 2025)
- Pool and Spa Demolition, DD-5015-01, Maricopa County Planning and Development (adopted November 21, 2025)
- Swimming Pool Demolition, City of Mountain View
- Swimming Pool Demolition, City of San José (updated April 14, 2026)
What to price for the yard next
- Home improvement costs in 2027: the complete price guide
- Pool liner replacement cost, and how it runs over budget
- What a 20×20 paver patio costs
- Lawn vs low-maintenance yard costs over 10 years
- Sprinkler system cost and upkeep
- Plunge pool cost, installed
Pricing method: prices were researched in November 2026 for 2027 planning and may change. Figures come from national cost guides and local building department pages; your contractor’s quote and your permit office have the final word. See our disclaimer.
















